Utilities
- Wastewater Treatment Plant / Lift Station
The Water Treatment Plant Division consists
of 27 employees:
Wastewater Treatment Plant Superintendent -
A License
Assistant Wastewater Treatment Plant Superintendent - A License
Chief Operator - A License
Laboratory Technician III Supervisor - B License
Maintenance Service Person
Maintenance Crew Chief
Plant Operator 1 - D License (2)
Plant Operator 2 - C License (4)
Serviceman 2
Plant Operator 3 - B License (3)
Plant Operator 4 - A License
Electrician
2
Pretreatment Inspector
Wastewater Specialist - A License
Lift Station Supervisor - A License
Lift Station Foreman - Collection III License
Lift Station Operator 1 - C License (3)
Lift Station Operator 1 - No License
Lift Station Operator 3 - Collection III License.
|
| Duties
and Responsibilities |
-
Check
all equipment and read all K watts, elapsed and flow meters.
-
Clean
three (3) grit baskets, seven (7) scum boxes, three (3) telescopic
RAS valves and one (1) contact chamber.
-
Pump
sludge from six (6) final clarifiers to three (3) aerobic digesters,
one (1) Belt Filter Press or twenty-four (24) sludge-drying
beds.
-
Adjust
chlorine and de-chlorination feed rates.
-
Collect
samples from plant, lift stations, influent, effluent, and individual
units.
-
Adjust
flow and recirculation pumps and valves as needed.
-
Check
aerobic digesters, decant, and waste into one (1) Belt Filter
Press or twelve (12) sludge drying beds when necessary.
-
Unstop
and prime pumps as needed.
-
Waste
approximately 2,500,000 cubic feet of sludge from three (3)
aerobic digesters, one (1) Orbal system, one (1) Aeration Basin,
and two (2) Oxidation Ditches per year.
-
Remove
approximately 1,000,000 cubic feet of dried sludge from drying
beds and dispose at Sanitary Landfill per year.
-
Maintain
plant pumps, grounds, structures, and buildings
|
| Goals
and Objectives |
-
Operate
and maintain the Wastewater Treatment Facility so as to provide
proper treatment of raw sewage waste as required by the EPA
and TCEQ.
-
Comply
with EPA and TCEQ rules and regulations for permit effluent
requirements, plant operation and maintenance, laboratory testing
and reporting, and sludge treatment and disposal.
-
Complete
the expansion of the existing Orbal Plant to four (4.0) MGD
to comply with the new permit effluent limits set by the TCEQ
and the EPA while meeting increased treatment demands caused
by the growth of the city.
-
Implement
the Pre-Treatment Program to comply with the EPA and TCEQ Industrial
Regulatory requirements.
-
Implement
treatment at the Wastewater Treatment Plant to reduce odor and
corrosion caused by hydrogen sulfide gas.
-
Implement
a contractual wastewater bio-solids management and beneficial
reuse program.
-
Implement
the Master Plan for Wastewater Collections, Lift Stations, and
Treatment Plant.
-
Eliminate
as many lift stations as possible according to the Master Plan.
-
Renovate
and rehabilitate as much existing lift stations as possible.
|
| General
Information |
|
The
Wastewater Treatment Plant is located at 1202 N. "M" Road and operates
24 hours per day, 7 days a week, and 365 days a year for the proper
treatment of raw sewage waste. The City owns and operates
its own wastewater system. The wastewater treatment plant
is a combination of the conventional type and an oxidation ditch
type with a total treatment capacity of 5.3 MGD with a permit capacity
of 5.9 MGD. The aeration tank treatment plant has a capacity
of 1.9 MGD, and the oxidation ditch plant has a capacity of 1.4
MGD. In July 1998, the City completed the construction of
an expansion to its existing wastewater treatment plant, which consisted
of an orbal biological treatment system with a capacity of 2.0 MGD
aeration. The City is currently in the design phase for the
construction of an additional treatment capacity of 2.0 MGD.
The scope of work planned for the expansion includes the headworks
with screening and de-gritting units, the addition of the 3rd outer
ring to the Orbal unit, the addition of another clarifier to the
Orbal plant, and a standby generator for the Orbal plant.
The City is currently in compliance with all state and federal permit
requirements for the discharge of wastewater.
|
Plant
Location
|
1202
North "M" Road |
| Plant
Lift Location |
|
| Old
Plant Lift Pumping Capacity |
|
Pump #1
|
6.1
MGD |
|
Pump
#2
|
3.4
MGD |
|
Pump #3
|
3.4
MGD |
|
Total
Treatment Capacity
|
12.9
MGD |
| New
Orbal System Plant Lift Pumping Capacity |
|
Pump
#1
|
4.03
MGD |
|
Pump
#2
|
4.03
MGD |
|
Pump
#3
|
4.03
MGD |
|
Total
Treatment Capacity
|
12.09
MGD |
|
Treatment
Plant
|
Design
|
Yr.
Constructed
|
Capacity
|
|
|
Orbal
System
|
1999
|
2.0
MGD
|
|
#4
|
Oxidation
Ditch
|
1986
|
1.4
MGD
|
|
|
Aeration
Basin
|
1997
|
1.9
MGD
|
|
Total
Treatment Capacity
|
5.3
MGD
|
|
| Natural
Gas Blowers |
|
(2)
Electric Blowers
|
100
HP @1765 rpm (each) |
|
(3)
3306 Caterpillar NG Engines
|
145
HP @1800 rpm (each) |
| Sludge
Digesters |
|
(3)
Aerobic Digesters
|
367,000
Gal. Capacity ea. |
|
Total
Sludge Capacity
|
1,101,000
Gal. * |
|
Belt
Filter Press (1)
|
Klampress
Type 94
Size 2.0 Meter |
| Sludge
Drying Beds |
|
(11)
35' x 40' Sand Beds
|
1,400
Sq. Ft. ea. = 16,800 |
|
(10)
40' x 80' Sand Beds
|
3,200
Sq. Ft. ea. = 38,400 |
|
Total
|
55,200 |
| Disinfection |
|
Chemical
|
Gas
Chlorine |
|
(3)
Chlorinators
|
500
pounds per day each |
|
Total
Capacity
|
1,500
pounds per day |
| Dechlorination |
|
Chemical
|
Sodium
Bisulfate |
|
(1)
Chemical Feed Pump
|
96
gallons per day |
|
Total
Capacity
|
96
gallons per day |
|
Average
Treatment Per Day
|
4.0
MGD |
|
Percentage
of Treatment Capacity
|
75% |
|
Average
Total Treatment Per Year
|
1.460
Billion Gallons |
| Permit
Numbers |
| TCEQ
(State) |
TPDES
No. 10503-002 |
| EPA |
TX0024112 |
| *
Currently Not in Operation |
|
|